Architect as project manager
of Оriginal projects


KONNOVA Margarita

"The first start-up complex was built  in 2011 .Get on with construction of the 2-nd start-up complex  was decided in 2015. The 2-nd start-up complex provided for  construction of additional spaces with 2  floors, expansion of existing warehouse – unloading area  with 5  overload systems, co-packing area  on  the  first  floor, administration  and  accommodation  rooms   and office rooms. Additional areas   are  2 329,45 m2,  technologic communication between floors was made through cargolift, which  moves  product on pallets with safety.  Our company realized  field supervision  under  terms of the  contract,  support  of construction  and  installation  works,  consulting, design development and their adaptation to up to date  requirements. For example, mercury vapor lamps of industrial luminaires  were  changed  to modern  energy  saving  diode  lamps.  Realization of the 2-nd start up complex finished expressive elements of architecture of plantbuilding  line at prospect Stroiteley".

Project implementation period: 2015
Total project area: 2 329 m 2
Building area: 1 184 m 2
Building volume: 16 005 m 3