"Reconstruction project  provides  for  demounting  of  part  production building, construction of lean-to and reconstruction of ventilation chamber rooms   and   switchboard   room  for  location  6  additional  raw material storage tanks.Reconstructed building is  meant  for   location of tanks  with  tank volume 90 m3,   for raw material storage for liquid  detergents  production. At  first room held 7 tanks, after reconstruction  raw-material store  of liquid  detergents holds  13 tanks. In the building of the shop were designed following functional spaces and rooms:  room of raw material storage Rewoquat WE 18, room of liquid raw material storage. For tank maintenance provided maintenance platforms at the elevation of +6.175".

Project implementation period: 2015
Total project area: 498 m 2
Building area: 533 m 2
Effective area: 498 m 2
Building volume: 5 341 m 3