Chief Architect of Original projects SOCHNEV Alexander |
![]() |
"Reconstruction project provides for demounting of part production building, construction of lean-to and reconstruction of ventilation chamber rooms and switchboard room for location 6 additional raw material storage tanks.Reconstructed building is meant for location of tanks with tank volume 90 m3, for raw material storage for liquid detergents production. At first room held 7 tanks, after reconstruction raw-material store of liquid detergents holds 13 tanks. In the building of the shop were designed following functional spaces and rooms: room of raw material storage Rewoquat WE 18, room of liquid raw material storage. For tank maintenance provided maintenance platforms at the elevation of +6.175".